When to start new construction home ?

When to Commence Construction of Your House

Well, constructing the palace of your dream can be done anytime. However, it is advisable to go for auspicious timing for this noble purpose. Paush (January), Phalgun (March), Baisakh (May) and Margshirsh (December) are the greatest months for foundation-laying. Margshirsh, Magh, Falgun, Baishakh, Shravan, Bhadrapad along with Kartik are acceptable. All the other months apart from the ones listed below, are first-class for laying the foundation.

Best time to begin construction:

For most favorable construction, dry and cool spring weather is the most excellent. if you are planning to start building before in the spring, the foundation, framing as well as exterior of the home must be completed earlier than the weather gets too hot. Subsequently focus can be shifted to completing inside elements for the duration of those hot summer months.

Age for building a house:

Next comes purchasing an initial home, at age 29, plus expanding the family with additional children at 30. Financial independence ought to be reached at age 32, as well as the survey found that the consensus on the greatest age to build a forever residence is 37 years.

Can you construct a house in three months?

Depending on the site as well as zoning classification, it usually takes from 3 to 6 months to construct a house.

Can we start house construction during rainy season?

In case you decide to commence building your own residence during monsoon, the backend work needs typically three to four months. Thus if you begin your planning during the monsoon, the construction work at site will initiate construction works at your plot begins can as monsoon set up descended or would have absolutely gone.

What happens in case it rains while building a house?

Now a days most modern building materials, the roof outer layer will not be harmed by rain, since some new covering has a waterproof coating. Typical rainwater will not spoil the wood that is utilized to build homes. A lot of homeowners fear that wood will straight away rot if permitted to get wet.

What are the phases of building a house?

A Step-by-Step Direction to the Home Building Process

  1. Organize Construction Site and Pour Foundation.
  2. Finish Rough Framing.
  3. Finish Rough Plumbing, Electrical HVAC.
  4. Put in Insulation.
  5. Finish Drywall and Interior Fixtures, Begin Exterior Finishes.
  6. Complete Interior Trim, Install Outside Walkways and Driveway.

Know more

Construction and Building Material is used when

Building Superstructure

Lot of Material Required to build Super structure. Comaron Gurgaon provides you all the product related to Super structure for any construction.

Details
Constructing Boundary Wall and Gates

Beautiful Gates and Compound wall design are avaible in the market. Comaron Gurgaon provides complete solution

Details